{"id":5636,"date":"2022-07-11T16:59:36","date_gmt":"2022-07-11T11:29:36","guid":{"rendered":"https:\/\/ijpiel.com\/?p=5636"},"modified":"2022-07-11T23:22:11","modified_gmt":"2022-07-11T17:52:11","slug":"environment-clearances-and-systems-in-epc-and-infrastructural-projects","status":"publish","type":"post","link":"https:\/\/ijpiel.com\/index.php\/2022\/07\/11\/environment-clearances-and-systems-in-epc-and-infrastructural-projects\/","title":{"rendered":"Environment Clearances and Systems in EPC and Infrastructural Projects"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221; inline_fonts=&#8221;Cormorant Garamond&#8221;]<\/p>\n<p><span style=\"font-family: 'Cormorant Garamond'; font-size: x-large; font-weight: normal; color: #000000;\"><strong>Abstract<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">This Blog Post talks about various aspects of environmental clearances, corporate and industrial regulations and general practices behind the Engineering, Procurement, and Construction (EPC)-based projects. In light of the dynamic changes in the regulatory framework, it is essential to understand the interplay between developmental projects and the environment. Further, the purpose of this Blog Post is to understand how one can maintain international standards and practices and at the same time achieve sustainable development goals.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">It is for this reason that government establishments around the world introduced the concept of Environmental Clearance, a process in which each project is required to maintain certain environmental standards prior to commencement of work. In fact, the Environmental Impact Assessment (EIA) Notification, 2006 mandates all mid and high-scale Infrastructural projects to take permission for activities like mining, generating energy through the thermal power plant, building infrastructure etc.<\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">Objective of Environmental Clearance<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The idea of certification\/clearance is to ensure minimal environmental impact from the planned project and to create further a mechanism to regulate environmental clearances.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">As per the<a style=\"color: #000000;\" href=\"http:\/\/environmentclearance.nic.in\/writereaddata\/EIA%20Notifications.pdf\">EIA Notification, 2006<\/a> issued by the Ministry of Environment and Forest &amp; Climate Change, Government of India, it is essential that each site\/establishment identified for proposed development must get environmental clearance before the start of the project. However, in the draft EIA notification 2020, the concerned Ministry has proposed to allow all industrial projects to start operations without a valid environmental clearance and get post-facto approval. While some believe this would encourage investment and rapid growth, those advocating for sustainable development goals see the notification as detrimental to the environment and contrary to the objectives of Environmental Clearance. This draft is going to replace the EIA notification of 2006.<\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">Procedure for Environmental Clearance<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The applicant is required to furnish the conceptual plan along with the application in Form 1 and the supplementary in Form 1A. Thus, categorization has been done to streamline the process for different types of projects. The details are as follows:<strong style=\"text-align: left;\">\u00a0<\/strong><\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: large; color: #000000;\"><a style=\"color: #000000;\" href=\"http:\/\/environmentclearance.nic.in\/writereaddata\/EIA_notifications\/2006_09_14_EIA.pdf\"><strong>Zone Categorization and the Threshold<\/strong><\/a><\/span><\/p>\n<table width=\"665\">\n<tbody>\n<tr>\n<td width=\"35\"><\/td>\n<td style=\"text-align: center;\" width=\"143\"><span style=\"color: #000000; font-size: large;\"><strong>Project\/Activity<\/strong><\/span><\/td>\n<td style=\"text-align: center;\" width=\"103\"><span style=\"font-size: large; color: #000000;\"><strong>Category B<\/strong><\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"384\"><span style=\"font-size: large; color: #000000;\"><strong>General Conditions<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"35\"><span style=\"font-size: large; color: #000000;\">8<\/span><\/td>\n<td colspan=\"4\" width=\"630\"><span style=\"font-size: large; color: #000000;\">Area Development projects, Building, Construction projects and Townships;<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"35\"><span style=\"font-size: large; color: #000000;\">8(a)<\/span><\/td>\n<td width=\"143\"><span style=\"color: #000000; font-size: large;\">Building and Construction projects<\/span><\/td>\n<td colspan=\"2\" width=\"104\"><span style=\"font-size: large; color: #000000;\">&gt;20,000 sq. meters and &lt;1,50,000 sq. meters<\/span><\/td>\n<td width=\"383\">\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">&#8220;Any project or activity specified in Category &#8216;B&#8217; will be treated as built-up area# Category &#8216;A&#8217; if located in whole or in part within 10 km from the boundary of:<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">(i) Protected areas notified under the Wildlife (Protection) Act, 1972;<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"35\"><span style=\"font-size: large; color: #000000;\">8(b)<\/span><\/td>\n<td width=\"143\"><span style=\"font-size: large; color: #000000;\">Townships and Area Development projects<\/span><\/td>\n<td style=\"text-align: justify;\" colspan=\"2\" width=\"104\"><span style=\"font-size: large; color: #000000;\">Covering an area &gt; 50 ha and or built-up area \u2265 1,50,000 sq meters ++<\/span><\/td>\n<td width=\"383\">\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">(ii) Critically polluted areas as identified by the Central Pollution Control Board from time to time;<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">(iii) Eco-sensitive areas as notified under section 3 of the Environment (Protection) Act, 1986, such as Mahabaleshwar Panchgani, Matheran, Pachmarhi, Dahanu, Doon Valley and<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">(iv) inter-state boundaries and international boundaries.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Provided that the requirement regarding the distance of 10km of the inter-state boundaries can be reduced or completely done away with by an agreement between the respective states or UTs sharing the common boundary in the case the activity does not fall within 10 kilometers of the areas mentioned at item (1), (11) and (ii) above<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"35\"><\/td>\n<td colspan=\"4\" width=\"630\"><span style=\"font-size: large; color: #000000;\">++All projects under Item 8(b) shall be appraised as Category B1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"35\"><\/td>\n<td width=\"172\"><\/td>\n<td width=\"103\"><\/td>\n<td width=\"1\"><\/td>\n<td width=\"354\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><\/h2>\n<h2><\/h2>\n<h2><span style=\"font-size: x-large;\"><strong>Indian Regulatory Regime<\/strong><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">The recent proposal, i.e., the<\/span><a href=\"https:\/\/www.google.com\/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=&amp;ved=2ahUKEwiPqPiIkuf4AhUdRWwGHUTAAB0QFnoECAYQAQ&amp;url=http%3A%2F%2Fenvironmentclearance.nic.in%2Fwritereaddata%2FDraft_EIA_2020.pdf&amp;usg=AOvVaw0X4aItQ0wqo2CnkYCjp4X9\">draft EIA notifications, 2020<\/a><span style=\"color: #000000;\">, apart from encouraging industrialization, has also ushered in a new regulatory framework governing environmental clearances for various industrial projects. The range of projects covered by the new notification includes dams, mines, highways etc. Additionally, multiple actions earlier considered an offence have been legitimized. For instance, for some projects, no environmental clearance is needed before starting construction where the area is &gt;20000 square meters.<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">It is believed that the new set of rules, apart from weakening the public consultation process, would be prejudicial to the stakeholders, including local people at the proposed development site. The concerned Ministry has even increased the list of projects where a public hearing is not required prior to environmental clearance(s) and exempted public hearings of projects that propose modernization. This is contrary to the view taken by the Apex Court in a catena of judgments where the Hon\u2019ble Court has expressed concerns over industrial projects operating without the requisite permissions. While the Supreme Court of India has repeatedly harped upon balancing development alongside the environment, the introduction of the draft EIA notification 2020 may destroy the environment. In light of this, it is essential to adopt an \u201cecologically rational outlook\u201d to balance the interests of all stakeholders.<\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">Environmental Management Systems<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>What is an Environment Management System? <\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The Environmental Management System (<strong>EMS<\/strong>) is a robust platform that allows organizations to consistently review, evaluate and improve their environmental performance in sync with the environmental goals. The EMS assesses the environmental performance based on objectives and targets set by the organization(s). It addresses the regulatory requirements and helps evolve proactive approaches to minimize non-compliance and adopt safe practices for the organization. The EMS, in a nutshell, is a systematic regulatory framework which is cost-effective and user-friendly. It also helps in addressing the non-regulated issues, such as energy conservation, in addition to promoting strong operational control and employee stewardship.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>Reasons to adopt EMS:<\/strong><\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"font-size: large; color: #000000;\">It aligns the organization&#8217;s environmental goals with the environmental impacts of the proposed development plan;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Lays down compliance obligations to minimize non-compliance and helps avoid regulatory\/ legal hassles;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Monitors and measures progress based on certain parameters;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Enhances employees&#8217; knowledge about the environment; and<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Provides effective tools to achieve objectives and targets.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>What determines an effective environmental management system? <\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">For EMS to become successful, each and every functionary from top to bottom in the organization must work in tandem with the company objectives and use the available tools on EMS efficiently to maximize the benefits of the stakeholders.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>The Benefits associated with EMS are as follows:<\/strong><\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"font-size: large; color: #000000;\">Improves environmental performance and encourages compliance;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">In certain cases, EMS is able to prevent pollution and conserve resources;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Apart from boosting employee morale, the organization&#8217;s public image is enhanced, leading to new customers\/markets;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Increases efficiency and reduces costs for compliance purposes;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">EMS has helped improve employee awareness about environmental issues.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>How does EMS conform to the International Standards? <\/strong><\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"font-size: large; color: #000000;\">By self-determination and self-declaring policy framework;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">By considering the interests of all stakeholders in the organization;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">By allowing the external organization to certify\/register the EMS.<\/span><strong style=\"color: #000000; font-size: large;\">\u00a0<\/strong><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>Leadership, Commitment and Decision Making<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The management of each organization must demonstrate commitment toward the environmental management system by:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"font-size: large; color: #000000;\">acting responsibly and taking accountability;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">ensuring the environmental policy is made compatible with the organization&#8217;s objectives;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">ensuring integration of the EMS requirements with the company\u2019s business processes<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">communicating effectively about environmental management;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">ensuring that the EMS achieves its intended outcomes and encourages improvement;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Adopting relevant management roles for efficiency.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>Environmental Considerations<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">To protect the environment, the organization must take into account:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"font-size: large; color: #000000;\">The dynamic changes in the environment (both planned and unplanned);<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">The conditions and reasonably foreseeable emergencies by using established parameters. The aspects possibly having a significant environmental impact must be considered.<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Documented information on the environmental impacts and criteria used to assess the significant environmental aspects.<\/span><strong style=\"color: #000000; font-size: large;\">\u00a0<\/strong><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>Compliance Obligations<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The organization must:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"font-size: large; color: #000000;\">Identify and determine the compliance obligations related to environmental impacts due to the proposed development plan;<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Decide how to achieve organizational goals and compliance obligations applicable to the organization<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Establish, implement, maintain and improve the EMS.<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Maintain documented information for compliance purposes.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><strong>Communication<\/strong><\/span><\/p>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Internally communicate information relevant to the EMS across the board of the management, including a proposal to change the environmental management system for effective compliance and efficiency;<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The organization must externally communicate information relevant to the EMS, as established in line with the compliance obligations of the organization.<\/span><\/li>\n<\/ul>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-5642 size-full\" src=\"https:\/\/ijpiel.com\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-11-at-4.47.51-PM.jpeg\" alt=\"\" width=\"920\" height=\"614\" srcset=\"https:\/\/ijpiel.com\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-11-at-4.47.51-PM.jpeg 920w, https:\/\/ijpiel.com\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-11-at-4.47.51-PM-480x320.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 920px, 100vw\" \/><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-5641 size-full\" src=\"https:\/\/ijpiel.com\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-11-at-4.47.51-PM-1.jpeg\" alt=\"\" width=\"932\" height=\"550\" srcset=\"https:\/\/ijpiel.com\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-11-at-4.47.51-PM-1.jpeg 932w, https:\/\/ijpiel.com\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-11-at-4.47.51-PM-1-480x283.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 932px, 100vw\" \/><\/p>\n<p><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong>Review<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The top management should regularly review the organization\u2019s management systems to assess the effectiveness and efficiency of the EMS:<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><u>Review to include considerations of:<\/u><\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"font-size: large; color: #000000;\">The previous review of action taken, including the changes embraced in addressing the external and internal issues in the EMS<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">The legitimate interest of stakeholders<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">The extent of achievement of the environmental objectives<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Trends in non-conformities<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Monitoring and measurement of results<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Audit results<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Adequacy of resources<\/span><\/li>\n<li><span style=\"font-size: large; color: #000000;\">Opportunities for continual improvement<strong>\u00a0<\/strong><\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><u>Output of management review to include: <\/u><\/span><\/p>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Conclusions on continuing suitability<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Decisions related to continual improvement strategies<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Actions needed in case the environment objectives have not been achieved<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Opportunities to improve integration of environmental management systems<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Implication for strategic directions of the company<\/span><\/li>\n<\/ul>\n<p><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong>Improvement <\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">The organizations to determine opportunities for improvement and implement necessary actions.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><u>In cases of non-conformity: <\/u><\/span><\/p>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Organization to react and take action to control it<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Mitigate the adverse environmental impact<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Review the non-conformities<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Analyze if similar non-conformities exist<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Review effectiveness of corrective actions<\/span><\/li>\n<\/ul>\n<p><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">Judicial Precedents<\/strong><\/span><\/p>\n<p style=\"text-align: justify; padding-left: 30px;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">1.<\/span><em><a href=\"https:\/\/indiankanoon.org\/doc\/26954785\/?type=print\"><strong>Rajeev Aggarwal v. North Delhi Municipal Corporation &amp; Others<\/strong><\/a><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">On a complaint preferred by the applicant stating commercial activities were being undertaken in residential areas of Nai Sadak, Delhi, contrary to the environmental norms, the National Green Tribunal took cognizance and directed the appointment of a Monitoring Committee to inspect the premises. As per the reports of Monitoring Committee and the Deputy Commissioner of Police, environmental compensation of INR 2 lakhs was imposed on each violator for running impermissible activities. Since no objection was filed by the applicant on the reported discrepancies, NGT directed the relevant authorities to ensure recovery of environmental compensation expeditiously, not later than three months.<\/span><\/p>\n<p style=\"text-align: justify; padding-left: 30px;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">2.<\/span><em><a href=\"https:\/\/indiankanoon.org\/doc\/173496416\/?type=print\"><strong>Prabhat Mohan Pandey v. MP SEIAA regarding sand mining in Madhya Pradesh<\/strong><\/a><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">As per the appellants, Madhya Pradesh Sand Mining Rules, 2019 was introduced on August 30, 2019 wherein every district was required to have its own contractor or a group of contractors to carry out sand excavation from the declared and demarcated sand queries.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">The NGT, on February 22, 2022, directed the state of Madhya Pradesh to follow the guidelines issued in<\/span><a href=\"https:\/\/www.google.com\/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=&amp;cad=rja&amp;uact=8&amp;ved=2ahUKEwivrMaXlef4AhU6R2wGHRMkDpgQFnoECAcQAQ&amp;url=http%3A%2F%2Fenvironmentclearance.nic.in%2Fwritereaddata%2FSandMiningManagementGuidelines2016.pdf&amp;usg=AOvVaw2ZlvfUQbqYJgDZwGB0XQ2u\">Sustainable Sand Mining Guidelines 2016 (SSMG-2016)<\/a> <span style=\"color: #000000;\">as well as<\/span><a href=\"https:\/\/www.google.com\/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=&amp;cad=rja&amp;uact=8&amp;ved=2ahUKEwiwyLaklef4AhVARWwGHXHXC3kQFnoECAYQAQ&amp;url=http%3A%2F%2Fenvironmentclearance.nic.in%2Fwritereaddata%2FSandMiningManagementGuidelines2020.pdf&amp;usg=AOvVaw0yylhOb-_jOPvuUfDnOHdX\">Enforcement and Monitoring Guidelines for Sand Mining, 2020 (EMGSM-2020<\/a><span style=\"color: #2ea3f2;\">)<\/span><span style=\"color: #000000;\">, in addition to preparing an environment management plan, replenishment plan, mine closure plan etc. Further, the State Government was to assess and propose strategies to recover compensation, seize and release vehicles involved in illegal mining and make other safeguards by providing grievance redressal, accountability of designated officers and periodical reviews.<\/span><\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">Conclusion<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">In today\u2019s world while on one hand it is essential to protect the environment, it is equally important to encourage economically viable projects. Therefore, in light of the above discussions, there is an urgent need to create a balance between engineering, structural marvel and power and protection of the environment.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Moreover, since the global EPC market is worth billions of dollars, each company\/ government organisation spearheading these projects must follow both international and domestic protocols for protecting the environment.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Further, in order to avoid delays in executing projects and loss of revenue, the environmental management systems must be adopted to help mitigate the potential disasters. This will ensure timely execution of developmental projects in a safe environment. Thereby creating balance between development and environment.<\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong>Disclaimer<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\"><em>The views and opinions expressed by the authors are personal.<\/em><\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">About the Authors<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Mr. Anuraag Mehta is a Corporate Commercial Litigator at Delhi High Court.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Ms. Swamini Chhibber is a global legal EPC and energy law practitioner.<\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-family: 'Cormorant Garamond'; font-size: x-large; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">Editorial Team<\/strong><\/span><\/p>\n<p><span style=\"font-size: large; color: #000000;\"><em>Managing Editor: Naman Anand<\/em><\/span><\/p>\n<p><span style=\"font-size: large; color: #000000;\"><em>Editors-in-Chief: Jhalak Srivastava &amp; Muskaan Singh<\/em><\/span><\/p>\n<p><span style=\"font-size: large; color: #000000;\"><em>Senior Editor: Hamna Viriyam<\/em><\/span><\/p>\n<p><span style=\"font-size: large; color: #000000;\"><em>Associate Editor: Swadha Sharma<\/em><\/span><\/p>\n<p><span style=\"font-size: large; color: #000000;\"><em>Junior Editor: Kaushiki Singh<\/em><\/span><\/p>\n<p><span style=\"font-size: large; color: #000000;\"><em><\/em><\/span><\/p>\n<p><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong>Preferred Method of Citation<\/strong><em>\u00a0<\/em>\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">Anuraag Mehta and\u00a0Swamini Chhibber, &#8220;Environment Clearances and Systems in EPC and Infrastructural Projects&#8221;\u00a0(IJPIEL, 11 July 2022)\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">&lt;https:\/\/ijpiel.com\/index.php\/2022\/07\/11\/environment-clearances-and-systems-in-epc-and-infrastructural-projects\/&gt;<\/span><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221; inline_fonts=&#8221;Cormorant Garamond&#8221;] Abstract This Blog Post talks about various aspects of environmental clearances, corporate and industrial regulations and general practices behind the Engineering, Procurement, and Construction (EPC)-based projects. In light of the dynamic changes in the regulatory framework, it is essential to understand the [&hellip;]<\/p>\n","protected":false},"author":177,"featured_media":5648,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":"","wp_social_preview_title":"","wp_social_preview_description":"","wp_social_preview_image":0},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts\/5636"}],"collection":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/users\/177"}],"replies":[{"embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/comments?post=5636"}],"version-history":[{"count":10,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts\/5636\/revisions"}],"predecessor-version":[{"id":5653,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts\/5636\/revisions\/5653"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/media\/5648"}],"wp:attachment":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/media?parent=5636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/categories?post=5636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/tags?post=5636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}