{"id":6279,"date":"2022-12-30T00:49:56","date_gmt":"2022-12-29T19:19:56","guid":{"rendered":"https:\/\/ijpiel.com\/?p=6279"},"modified":"2022-12-30T01:05:38","modified_gmt":"2022-12-29T19:35:38","slug":"morbi-bridge-collapse-the-apparent-concession-dysfunctionality","status":"publish","type":"post","link":"https:\/\/ijpiel.com\/index.php\/2022\/12\/30\/morbi-bridge-collapse-the-apparent-concession-dysfunctionality\/","title":{"rendered":"Morbi Bridge Collapse: The Apparent Concession Dysfunctionality"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221; min_height=&#8221;181px&#8221; custom_padding=&#8221;|0px||||&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221; inline_fonts=&#8221;Cormorant Garamond,Molengo,Cormorant,Cormorant Infant&#8221;]<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">During the late evening of October 30, 2022, a 141-year-old bridge suspended with wires over the Machchu river of Gujarat broke loose and submerged under water leading to the casualty of approximately 141 people. The bridge, known as<\/span><a href=\"https:\/\/www.businesstoday.in\/latest\/trends\/story\/morbi-bridge-collapse-company-in-the-eye-of-the-storm-is-the-owner-of-famous-wall-clock-brands-ajanta-and-orpat-351319-2022-10-31\">the \u201cjhulta pull\u201d<span style=\"color: #000000;\">,<\/span><\/a><span style=\"color: #000000;\"> was originally constructed during the period of 1858 \u2013 1922 by Waghji Thakur, the ruler of Morbi and had re-opened, only recently, for public visits, after being renovated by Ajanta Manufacturing Pvt. Ltd.\/Oreva Group. Post the incident, and it was brought to notice that the contractor was working under an expired Operations<strong> and Maintenance<\/strong> (\u201cO&amp;M\u201d) concession agreement within the alleged supervision of the Morbi Municipality.<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">Following the incident and after much speculation and scrutiny, several reports emerged wherein certain substantial shortcomings in the Tender process, the Contract and its management were highlighted. These lacunae were furthered by corruption and a severe absence of due procedure, thus culminating in an unfortunate incident and casualty.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">On the basis of the reports as well as the facts and circumstances, the Hon\u2019ble Gujarat High Court took<\/span><a href=\"https:\/\/timesofindia.indiatimes.com\/india\/consider-separate-probe-into-morbi-supreme-court-to-gujarat-high-court\/articleshow\/95670838.cms\"><em>suo moto cognizance<\/em><\/a> <span style=\"color: #000000;\">of the matter and initiated civil and criminal proceedings against several officials of the Morbi Municipal Corporation (\u2018Concessionaire\u2019) as well as against Ajanta Manufacturing Pvt. Ltd. (\u2018Contractor\u2019). An acknowledgement of these proceedings was also made by the Hon\u2019ble Supreme Court of India in the case of<\/span><a href=\"https:\/\/www.livelaw.in\/pdf_upload\/34939202212540010order21-nov-2022-445541.pdf\"><em>Vishal Tiwari v. Union of India<\/em><\/a><span style=\"color: #000000;\">, wherein the Bench comprising of the Hon\u2019ble Chief Justice of India held that,<\/span><\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">\u201c<em>Should it become necessary at any stage to move this Court at a later date, liberty is granted to the petitioners or to any other aggrieved to do so. We dispose of these proceedings, leaving it open to the petitioners to pursue their remedies before the High Court. Since the High Court is already seized of the suo moto proceedings, we request the High Court to take them up on a periodical basis so that the purpose of underlying the assumption of jurisdiction is duly fulfilled.\u201d<\/em><\/span><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">Thus, in lieu of an absence of due procedure, which led to the collapsing of a bridge, a dire need arose for a detailed examination of the procedure through which the alleged tender for the improvement and renovation of the bridge was awarded. This became necessary on account of the utter failure to comply with contractual obligations, the ultimate consequence of which was the ill-maintenance of a dilapidated ruin leading to the casualty and injury to a substantial number of people.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong style=\"color: #000000; font-size: large;\"><\/strong><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal;\"><strong style=\"color: #000000;\">General O&amp;M Concession Terms and their Apparent Lack Thereof<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">The first and foremost step in any basic concessionaire agreement is the Expression of Interest (EOI) or Tender, which is followed by bids from qualified bidders, who are required to submit their experience and financial quotations. Thereafter, the authority makes a selection from amongst the bidders on the basis of such experience and an ideal financial quote and signs the agreement with the awarded agency. However, in the case of the State of Gujarat,<\/span><a href=\"https:\/\/www.indiacode.nic.in\/bitstream\/123456789\/6151\/1\/infra_deve_act1999.pdf\">Section 110A of the Gujarat Infrastructure Development Act, 1999<\/a> <span style=\"color: #000000;\">(\u201cGIDA\u201d) allows the State Government or its agency (including any local authority operating under such agency) to enter into direct negotiations where the projects are covered within the ambit<\/span><a href=\"https:\/\/www.indiacode.nic.in\/bitstream\/123456789\/6151\/1\/infra_deve_act1999.pdf\">of Schedule III of the Act<\/a><span style=\"color: #000000;\">, where the said schedule lays down a quad-criteria for classifying an eligible project.<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">After completion of the aforementioned process, the agreement so signed consists of complex and detailed clauses, which seek to clearly define the rights of the Concessionaire as well as the contractor, so as to reduce friction. Amongst the different types of concession agreements, an O&amp;M concession agreement is the one adopted for contracts where the maintenance and operation of a structure are in question. Thus, for successful execution, it is necessary for the agreement to lay down an unambiguous listing of the duties of the contractor for the purpose of adequately maintaining the structure. Thus, under the legal system, the signing of a concession agreement is the consequence of a lengthy procedure filled with substantial steps and formalities, all of which have intricate value within the system. However, after the collapse of Jhulta Pull, the fact of complete absence of most of these steps and formalities surfaced, thus giving a prima facie inference to the moment when the ball started dropping.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">The various clauses which are, in actuality, present in the Indian concessionaire agreements include the following:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span style=\"color: #000000; font-size: large;\">A clause which seeks to enumerate the various obligations of the contractor through which it shall operate and maintain the property in question while performing all such services as may be necessary under the applicable laws;<\/span><\/li>\n<li><span style=\"color: #000000; font-size: large;\">An additional and important obligation put on the contractor is to apply, gain and comply with all the necessary Governmental Permits, including all necessary modifications, amendments and renewals of such approvals. Amongst these approvals, the contractor is also required to procure a \u201cFitness Certificate\u201d in certain cases. Such a certificate becomes necessary in cases where the structure in question is to be used by the public at large or when the concerns of safety become apparent;<\/span><\/li>\n<li><span style=\"color: #000000; font-size: large;\">In certain cases, these clauses are accompanied by a clause of limited scope where the contractor is precluded from sub-contracting the maintenance work to another company. However, this clause varies in different agreements and is dependent upon the region where the agreement is drawn. However, this clause is also subjective to the kind and nature of sub-delegation; that is, there may be cases where the contractor may be allowed by the Concessionaire to outsource a part of the maintenance. However, such delegation becomes a part of a consortium agreement;<\/span><\/li>\n<li><span style=\"color: #000000; font-size: large;\">On the note of sub-contracting, the contractor may be allowed by the agreement to hire or engage the services of another company after attaining due approval from the Concessionaire. However, such hiring or engagement is subject to the conditions imposed within the agreement and the types of obligations within.<\/span><\/li>\n<li><span style=\"color: #000000; font-size: large;\">As a practice, all concession agreements contain a Force Majeure clause which precludes the responsibility of either party upon a failure caused due to an unforeseeable event. However, a <em>\u2018force majeure\u2019<\/em> event only includes a case where the obligation under a Contract is prevented due to an act of the Government, act of war, act of God or any other such event which may not be in the control of the parties.<\/span><\/li>\n<li><span style=\"color: #000000; font-size: large;\">For the contractor, the most important clause in the agreement is the one that talks about the terms upon which the fee shall be levied for a speedy recovery and subsequent handover. While this clause may mention the actual amount or a percentage, such specifications are not always present.<\/span><\/li>\n<li><span style=\"color: #000000; font-size: large;\">Every concession agreement seeks to specify a minimum duration within which the maintenance work of the structure has to be completed. Indubitably, this clause may be considered as one of the fundamentals of such an agreement as it seeks to establish certain timelines, in the absence of which the maintenance will be indefinite, thus resulting in a significant loss to the Concessionaire.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">Majority of the above-mentioned clauses were apparently missing from the agreement between the Morbi Municipality and the Ajanta Oreva Group. The facts in the <em>suo moto<\/em> case (<\/span><em><a href=\"https:\/\/www.scconline.com\/Members\/NoteView.aspx?enc=SlRYVC05MDAxMzA1MjI0JiYmJiY0MCYmJiYmU2VhcmNoJiYmJiZmdWxsc2NyZWVuJiYmJiZ0cnVlJiYmJiZTdW8gTW90byAgU3RhdGUgb2YgR3VqYXJhdCwgMjAyMiBTQ0MgT25MaW5lIEd1aiAxODYwJiYmJiZBbGxXb3JkcyYmJiYmZ1NlYXJjaCYmJiYmZmFsc2U=\">Suo Motu v. State of Gujarat<\/a><\/em><span style=\"color: #000000;\">), the Hon\u2019ble Gujarat High Court observed that the agreement dated March 8, 2022, wherein the Concessionaire and the Contractor had been the alleged parties, was not actually approved by the Civic Body. It was further brought to the notice of the Hon\u2019ble Court that there was also a preceding MoU between the parties, which, although drawn on 16.06.2008 for a period of 9 years, was inconsequential owing to the absence of any action by the contractor. In fact, the entire communication between the Concessionaire and the contractor, wherein the alleged maintenance of the bridge was supposed to be the subject matter, only seemed to concern the price at which the tickets were to be drawn, which further reflected the disregard to the actual objective of the O&amp;M agreement.<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">It was further observed by the Hon\u2019ble Court that post the expiration of the otiose 2008 MoU in 2017, which was merely one-and-a-half pages long and was void of any definitions of the conditions or obligations of the contractor, the latter continued to act as the contractor and continued to operate and collect revenue from the dilapidated bridge, in spite of the fact that no new agreement or formal extension of the pre-existing agreement was drawn.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">Another aspect that came to light was the fact that the contractor had apprised the Concessionaire about the critical condition of the bridge and had claimed that the maintenance operations would not commence unless a new agreement was drawn, whereafter the impugned 2022 agreement was drawn. What was more peculiar was the fact that the signing of the latter 2022 agreement did not take place after following the process of floating a tender or any EOI; <em>that is<\/em>, the first step for the concession seemed to be absent.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large;\"><span style=\"color: #000000;\">In its observations before an open Court,<\/span><a href=\"https:\/\/www.livelaw.in\/news-updates\/morbi-incident-how-contract-of-renovation-granted-without-inviting-tender-gujarat-high-court-raises-questions-about-mou-for-bridge-maintenance-214137\">the Hon\u2019ble Bench posed<\/a> <span style=\"color: #000000;\">the following question to the accused:<\/span><\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">\u201c<em>From 15.06.2017, for a period of 2 years, without there being an MoU or agreement or entrustment, the bridge in question was continued to be maintained by Ajanta Company. After the said contract expired, what steps were taken by the official authorities to call for expression of interest or float a tender for a further period is not clear from the State\u2019s Affidavit?<\/em>\u201d<\/span><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">Furthermore, the Hon\u2019ble Court also observed that there was a complete absence of a valid \u201cFitness Certificate\u201d for the allegedly renovated bridge, which in fact, should have been a mandatory clause in any concessionaire agreement pertaining to the maintenance and operation of infrastructure.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">A \u201cFitness Certificate\u201d, as apparent from its name, is an essential element of any standing infrastructure. This certificate seeks to classify whether the maintenance of the structure, claimed to have been restored, is completed to the satisfaction of the appropriate authority and is fit to be used as per its primary objective. In the case of the jhulta pull, while the agreement lacked any such clause, the Hon\u2019ble Court observed that even the contractor did not take the necessary steps, in accordance with the contract, to get such certification.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large;\">Thus, the facts, as noted by the Hon\u2019ble Court, revealed not only a blatant neglect of duty but also a complete lack of the fundamental provisions in the Concessionaire Agreement that may have prevented the tragedy.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong style=\"font-size: 14px; text-align: left;\"><\/strong><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: x-large; font-family: 'Cormorant Garamond'; font-weight: normal; color: #000000;\"><strong style=\"text-align: left;\">Conclusion<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">It is needless to mention that a detailed comparison of the particulars of a general concessionaire agreement with that allegedly signed between Morbi Municipality and M\/s Ajanta Manufacturing Pvt. Ltd. make it evident that the unfortunate falling of the bridge was a result of severe dysfunction in due procedure and an absence of observance of the due process of law. Even if the factum of the applicability of Section 110A of the GIDA is accepted, the entrusting of maintenance operations on the contractor, in the complete absence of any conditions, may not be considered to be entirely ethical.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">It is also pertinent to mention that all such facts have been duly revealed before the Hon\u2019ble High Court of Gujarat, where the matter remains to be sub-judice, which keeps the discussion as to the defaulter and the severity of default open and lingering.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000; font-size: large; text-align: justify;\">In lieu of this, it only becomes more essential to note that the inception of the dropping ball started only after an impugned concession agreement and process came into existence, which further signifies the importance of such an agreement in Public-Private Partnerships (\u201cPPP\u201d) projects.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong style=\"text-align: left; color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large;\"><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong style=\"text-align: left; color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large;\"><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong style=\"text-align: left; color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large;\">About the Author<\/strong><span style=\"font-size: 14px; text-align: left;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: large; color: #000000;\">Ms. Sadiqua Fatma, Senior Partner at Legacy Law Offices LLP, Delhi.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong style=\"color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large;\"><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong style=\"color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large;\">Editorial Team<\/strong><span style=\"font-size: 14px; text-align: left;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: Molengo; font-weight: normal; color: #000000; font-size: large;\"><em>Managing Editor: Naman Anand<\/em><\/span><span style=\"font-size: 14px; text-align: left;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: Molengo; font-weight: normal; color: #000000; font-size: large;\"><em>Editors-in-Chief: Hamna Viriyam and Muskaan Singh<\/em><\/span><span style=\"font-size: 14px; text-align: left;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><em style=\"color: #000000; font-family: Molengo; font-size: large;\">Junior Editor: Kaushiki Singh<\/em><\/p>\n<p style=\"text-align: justify;\"><strong style=\"color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large; text-align: left;\"><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong style=\"color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large; text-align: left;\">Preferred Method of Citation<\/strong><em style=\"color: #000000; font-family: 'Cormorant Garamond'; font-size: x-large; text-align: left;\">\u00a0<\/em><span style=\"font-size: 14px; text-align: left;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: Molengo; font-weight: normal; color: #000000; font-size: large;\"><span size=\"4\" style=\"font-size: large;\">Sadiqua Fatma, &#8220;Morbi Bridge Collapse: The Apparent Concession Dysfunctionality&#8221;<\/span><span face=\"arial, sans-serif\">\u00a0<\/span><span size=\"4\" style=\"font-size: large;\">(IJPIEL, 29 December 2022)<\/span><\/span><span style=\"font-size: 14px; text-align: left;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: Molengo; font-weight: normal; color: #000000; font-size: large;\">&lt;https:\/\/ijpiel.com\/index.php\/2022\/12\/30\/morbi-bridge-collapse-the-apparent-concession-dysfunctionality\/&gt;<\/span><\/p>\n<p style=\"text-align: justify;\">\n<p>[\/et_pb_text][et_pb_gallery gallery_ids=&#8221;2750,5506&#8243; show_title_and_caption=&#8221;off&#8221; show_pagination=&#8221;off&#8221; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221; min_height=&#8221;181px&#8221; custom_padding=&#8221;|0px||||&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.5.1&#8243; _module_preset=&#8221;default&#8221; inline_fonts=&#8221;Cormorant Garamond,Molengo,Cormorant,Cormorant Infant&#8221;] During the late evening of October 30, 2022, a 141-year-old bridge suspended with wires over the Machchu river of Gujarat broke loose and submerged under water leading to the casualty of approximately 141 people. The bridge, known asthe \u201cjhulta [&hellip;]<\/p>\n","protected":false},"author":223,"featured_media":6286,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":"","wp_social_preview_title":"","wp_social_preview_description":"","wp_social_preview_image":0},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts\/6279"}],"collection":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/users\/223"}],"replies":[{"embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/comments?post=6279"}],"version-history":[{"count":6,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts\/6279\/revisions"}],"predecessor-version":[{"id":6289,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/posts\/6279\/revisions\/6289"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/media\/6286"}],"wp:attachment":[{"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/media?parent=6279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/categories?post=6279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ijpiel.com\/index.php\/wp-json\/wp\/v2\/tags?post=6279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}